CR 300 S Corridor Project

CR 300 South Corridor Project

Through a grant from the Indianapolis Metropolitan Planning Organization, the Town of Zionsville has partnered with the Boone County Highway Department to conduct a corridor study along CR 300 South from CR 800 East to the Boone/Hamilton county line. The purpose of this study is to identify a preliminary scope and a potential design of future road widening and intersection improvements considering feasibility, costs, impacts to properties, environmental concerns and bridge needs. 

While there is one known bridge replacement project planned within the next four years, there are no identified intersection or road projects at this time. The information learned from this study will initially guide bridge design as these structures are maintained and replaced as needed. Future intersection or roadway capacity projects will not be undertaken until the volume of vehicles and levels of service justify the improvements.

Listed below are the concepts that were provided at the Public Meeting that was held on October 10, 2019. 

If you have any questions in regards to this project.  Please contact John Beery at [email protected]



File Uploaded